Align one end of the lower eave strip even with the edge of the roof decking.
Fix drip edge roof detail.
Drip edge roof flashing types.
Use a metal snip to divide the portions of the drip edge in accordance with your measurements.
Drip edge is installed around the whole perimeter of the roof.
How to fix a roof drip edge installing roof drip edge flashing properly.
To locate rotted areas of the roof s edge gently lift up shingles with a pry bar or taping knife.
Custom color drip edge must be decided on a few weeks ahead of time to allow the lead time it will take a metal shop to fabricate the flashing.
Secure the drip edge at the areas where leaks were noted by driving 1 1 4 inch roofing nails through the surface at.
It is used to hold the underlayments down and create a watertight seal around the edge of the roof.
How to seal drip edges on a torch down roof 1.
Lift up roof shingles and nail the eave strip in place with galvanized roofing nails.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Install the eave strips on the lower roof edges first with the eave strips under the shingles and felt underlayment.
With the first section place the strip toward the edge of the fascia at the point where the titled border reaches the parallel side.
This is important to protect damage to your fascia soffits rafters.
Install roof drip edge along the eaves add underlayment then place drip.
Place the metal roof drip edge flashing along the gable ends.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
T shape drip edge is an l shaped flashing in which the long leg folds back on itself before heading down 90 degrees to form the short leg.
Lift courses or shingles from the asphalt adhesive strip on the course beneath it to inspect the.
Replacing drip edge eave strips.
Walk around the house and note the areas of the fascia board or overhang that show signs of a leak such as water.
With without rain gutters.
Once all the underlayment is applied go back and place.
Tools supplies tin sn.
L shape drip edge is a simple 90 degree bend with a flare out at the bottom of the short leg.
The drip edge should be installed on top of the underlayment at all rakes and below or on top of the underlayment at the eaves.